City Gate House
Abrasive blast cleaning and application of an intumescent FP Coasting System to columns over seven floors of a significant building refurbishment.
AELTC Wimbledon No.1 Court
Application of a protective coating system including a decorative metallic finish to new balustrades and brise-soleils on Wimbledon’s No.1 court
Shell Building
Application of a protective coasting system indulging decorative metallic finish toa new brise sole on a major South Bank building.
London Fire Station
Bristle Blast removal of existing coatings and application of an intumescent FP paint system to new steelwork inside an operational London Fire Station.
London Eye
In 2003 we secured the prestigious contract to paint the entire British Airways London Eye structure including the wheelrim, hub and spindle, the A-frame legs, boarding platforms and tidal riverside prows, piling, pontoons and dolphins. The coating system included use of a then new polysiloxane topcoat. Access methods included a combination of MEWP (including importing a 90m truck mounted vehicle from Europe) rope access and use of a jackleg barge with access and rescue craft. We have subsequently returned to site several times to undertake further projects including the rebranding of the wheelrim motor housings
Barbican Centre Conservatory
Hand mechanical preparation and recoating of the Barbicvan Centre Conservatory steelwork. Works were undertaken using access netting. The conservatory remained open to the public throughout our works.
Ascot Racecourse
Abrasive blast clean all site connections and application of a protective coating system followed by a complete HP waterjet and application of cosmetic coatings to new feature steelwork façade columns and beams.
British Museum Great Court roof
Preparation and application of protective coatings to the Norman Foster Designed Great Court Roof steelwork including a decorative metallic finish
Quex Park Bell Tower
Abrasive blast cleaning and protective coasting to a more than 100 year old decorative bell tower.
St. Pauls Cathedral Wren Railings
Abrasive blast cleaning at our clients yard of the original Sir Christopher Wren railings to remove old lead based coatings followed by on-site application of a decorative paint system.
G.L.A. Building Staircase
Preparation of site connections and application of protective and decorative coatings to the Greater London Authority building’s feature staircase.
Westminster Station
Abrasive blast clean and apply an anti-graffiti sealer coat to the concrete surfaces on the Jubilee Line Extension at Westminster LUL Station.